• Auxiliary cable for connecting to the auxiliary port (you can supply this cable or order one)
• Ratcheting torque screwdriver with a Phillips head that exerts up to 30 pound-force per square inch (in-lb)
of pressure
• Crimping tool as specified by the ground lug manufacturer
• 8 AWG copper wire for the power cord
• Wire-stripping tools for stripping both 6 AWG and 8 AWG wire
• Tape measure and level
Only trained and qualified personnel should be allowed to install or replace this equipment. Statement 49
Warning
Unpack and Verify Shipped Contents
Procedure
Step 1 Inspect the shipping container for any shipping damage. If there is obvious physical damage, contact your
Cisco service representative, else continue with the remaining steps.
Step 2 Unpack the router.
Step 3 Inspect the router.
Step 4 Use the following table to verify the contents of the container. Do not discard the shipping container. You
will need the container in the future if you move or ship the router.
What to do next
Table 9: Cisco NCS 560-4 Router Shipping Container Contents
DescriptionComponent
Cisco NCS560-4 RouterChassis
Fan Trays
Power Supplies
RSP
Interface Modules
19-inch rack mount brackets
Cisco NCS 560-4 Router Hardware Installation Guide
37
Preparing for Installation
Unpack and Verify Shipped Contents