APPENDIX E
Site Preparation and Maintenance Records
•
Site Preparation Checklist, page 57
•
Contact and Site Information, page 59
•
Chassis and Module Information, page 59
Site Preparation Checklist
Planning the location and layout of your equipment rack or cabinet is essential for successful switch operation,
ventilation, and accessibility.
The following table lists the site planning tasks that we recommend that you complete before you install the
switch. Your completion of each task ensures a successful switch installation.
Table 7: Site Preparation Checklist
Verification Time and DatePlanning Activity
Space evaluation:
Space and layout
Floor covering
Impact and vibration
Lighting
Physical access
Maintenance access
Environmental evaluation:
Cisco Nexus 9336PQ ACI-Mode Switch Hardware Installation Guide
57