3-56
3.9.2.3 Full PTI (F.PTI)
F.PTI consists of S.PTI and operation tests.
●Step display and contents
(step P00 to P32 are as same as S.PTI)
Step Content
P50 Check on pull-down to 0˚C
P60 Check on controllability of chilled
mode operation.
P70 Check on defrosting
P80
Check on pull-down from 0˚C through -18 ˚C
P90 Check on controllability of frozen mode
operation