S5200F-ON Series switch
Installation
To install the S5200F-ON Series (S5232F-ON, S5248F-ON, S5296F-ON, S5224F-ON, and
S5212F-ON) switch, complete the installation procedures in the order presented in this
section.
Always handle the switch and its components with care. Avoid dropping the switch or any
eld replaceable units (FRUs).
NOTE: ESD damage can occur if components are mishandled. Always wear an ESD-
preventive wrist or heel ground strap when handling the switch and its components.
As with all electrical devices of this type, take all the necessary safety precautions
to prevent injury when installing this switch.
Topics:
• Unpack
• Ground cable
• Rack or cabinet installation
• One-half U front-rack installation
• One U ReadyRails installation
• Two U four-post rack assembly
• DC power connections
• S5212F-ON only DC power connections
• Optics installation
• Switch power-up
• After switch installation
3
S5200F-ON Series switch Installation 11