2. MAJOR MAINTENANCE
15
· Install the special tool (compression gauge adapter) at
the nozzle holder hole, and connect the compression
pressure gauge there.
Standard value
28 kg/cm
2
over
Standard value
24 kg/cm
2
Difference
between each cylinder
Within ±10%
* Condition: Water temperature 20°C, Engine rotation
200rpm (10 rotations)
2.1.10 Injection nozzle
· Install a nozzle on the nozzle tester.
· If the inspected injection pressure is less than the specified value, adjust using the adjusting shims.
Engine Model
DE08TIS
Opening pressure
1st : 180 kg/cm
2
2nd : 280 kg/cm
2
· Check the atomizing state and replace it if abnormal.
2.1.11 Fuel injection pump
·Check the housing crack, damage etc. and replace it if abnormal.
·Check if the idle operation and speed regulating lever’s sealing is removed.
·The adjustment and testing of fuel injection pump should necessarily be done at the test bench.
2.1.12 Battery
·Inspect for any leakage of electrolytic solution owing to battery crack, and replace the battery in case of
poor condition.
·Inspect for amount of electrolytic solution, and replenish if insufficient.
·Measure the gravity of electrolytic solution, if less than specified value (1.12 ~ 1.28), replenish.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Doosan DE08TIS Series and is the answer not in the manual?

Doosan DE08TIS Series Specifications

General IconGeneral
BrandDoosan
ModelDE08TIS Series
CategoryEngine
LanguageEnglish

Related product manuals