Eaton 9130 700/3000 VA UPS User’s Guide 164201718—Rev 7 www.eaton.com/powerquality 12
Chapter 3 Installation
This section explains:
l
Equipment inspection
l
Unpacking the cabinet
l
Checking the accessory kit
l
Cabinet installation (rackmount and tower)
l
Wiring installation
l
Initial startup
Inspecting the Equipment
If any equipment has been damaged during shipment, keep the shipping cartons and packing materials for the
carrier or place of purchase and file a claim for shipping damage. If you discover damage after acceptance, file
a claim for concealed damage.
To file a claim for shipping damage or concealed damage: 1) File with the carrier within 15 days of receipt of
the
equipment; 2) Send a copy of the damage claim within 15 days to your service representative.
NOTE Check the battery recharge date on the shipping carton label. If the date has passed
and the batteries were never recharged, do not use the UPS. Contact your service
representative.
Unpacking the Cabinet
l
Unpacking the cabinet in a low-temperature environment may cause condensation to occur in
and on the cabinet. Do not install the cabinet until the inside and outside of the cabinet are
absolutely dry (hazard of electric shock).
l
The cabinet is heavy (see page 55 and page 56). Use caution to unpack and move the cabinet.
Use care when moving and opening the carton. Leave the components packaged until ready to install.
To unpack the cabinet and accessories:
1. Open the outer carton and remove the accessories packaged with the cabinet.
2. Carefully lift the cabinet out of the outer carton.
3. Discard or recycle the packaging in a respons
ible manner, or store it for future use.
Place the cabinet in a protected area that
has adequate airflow and is free of humidity, flammable gas, and
corrosion.