Before you install the UPS hardware you should carry out the following
preliminary checks:
1. Verify that the UPS room satisfies the environmental conditions
stipulated in the equipment specification, paying particular attention to the
ambient temperature and air exchange system.
2. Remove any packaging debris, then visually examine the UPS and
battery equipment for transit damage, both internally and externally.
Report any such damage to the shipper immediately.
3. Verify that the shipment is complete - e.g. that the battery contains the
correct number of cells. etc. Report any discrepancy immediately.
4. When you are satisfied that the equipment is complete and in good
condition move it to its proposed final position.
5. After fixing the unit in final position, remove transit support connected to
heavy wound components.