EasyManuals Logo
Home>Enterasys>Switch>SecureStack C2 C2G124-24

Enterasys SecureStack C2 C2G124-24 User Manual

Enterasys SecureStack C2 C2G124-24
78 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #65 background imageLoading...
Page #65 background image
SecureStack C2 Installation Guide 4-5
UP Off No valid connection to switch stackdown
connector.
1. Make sure the switch connected to
the stackdown connector is powered
on.
2. Replace cable with a known good
one.
3. If the problem still exists, contact
Enterasys Networks for technical
support.
Green Solid. Valid connection to switch stackdown
connector.
Blinking. Information is being transferred via the
high-speed stacking cable.
None.
Manager Off Switch is operating as a Member in the stack. None.
Green Solid. Switch is operating as the Manager of the
stack.
None.
RPS Off RPS not in use.
Internal power supply failure.
None.
If an RPS is connected to the switch and
should be providing power, perform the
following:
1. Ensure the RPS is powered on.
2. Ensure that the AC power cord to the
RPS is plugged in correctly and that
there is power at the AC power
source.
3. Replace the power cord with a known
good one.
4. Ensure the DC power cord from the
RPS to the switch is plugged in
correctly.
5. If the problem persists, contact
Enterasys Networks for technical
support.
Amber Solid. The switch internal power supply failed,
and the RPS is providing the proper power to the
switch.
None.
Figure 4-3 LANVIEW LEDs (Continued)
LED Color State Recommended Action

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Enterasys SecureStack C2 C2G124-24 and is the answer not in the manual?

Enterasys SecureStack C2 C2G124-24 Specifications

General IconGeneral
BrandEnterasys
ModelSecureStack C2 C2G124-24
CategorySwitch
LanguageEnglish

Related product manuals