3. MEASUREMENT
a. Preparation for measurement
1. Main unit
2. Slide lock
3. Base unit
1. Do not place the device at where outside light exposes it directly from the examinee side.
2. Make sure that the printer paper, the fuse and the chinrest liner are installed properly.
3. Refer to “7.1 Reload of Printer Paper”, “7.2 Fuse Replacement” or “7.3 Setting of Chinrest Liner” of “7.
Storage and Maintenance” of this manual for the installation procedures of the parts of (2) above.
4. After distributing the power, rotate the slide lock of the main unit (under the base unit) and release
the main unit.
b. Power distribution
1. Make sure that the power switch of the main unit is OFF ( ).○
2. Insert the power cord in the power plug connector of the main
unit and insert the power plug in a socket.
: Always make sure that the cable is grounded.
: Do not use an additional power strip or an extension cord.
3. Turn on the power switch (|) of the main unit.