3 Preparing to Install
Operating Environment Requirements
Rack Specifications and Recommendations
Evaluating and Meeting Cable Requirements
Meeting Power Requirements
Following Applicable Industry Standards
Before you install your Extreme Networks equipment, careful planning can help ensure that it is used
eectively and help prepare you for future growth.
Only qualified service personnel should install, maintain, or remove a switch, chassis, or its components.
Qualified service personnel have had appropriate technical training and experience that is necessary to
be aware of the hazards to which they are exposed when performing a task and of measures to
minimize the danger to themselves or other people.
Note
Before installing or removing any components of the system, and before carrying out any
maintenance procedures, read the safety information in Safety and Regulatory Information on
page 75.
The information in this chapter is intended for the system administrator, network equipment technician,
network manager, or facilities manager responsible for installing and managing the network hardware.
The chapter assumes a working knowledge of local area network (LAN) operations, and a familiarity
with communications protocols that are used on interconnected LANs.
This chapter covers the following aspects of site preparation:
1 Operating Environment Requirements on page 17
Verify that your site meets all environmental and safety requirements.
2 Rack Specifications and Recommendations on page 19
Ensure that mounting racks are safe and appropriate for the equipment.
3 Evaluating and Meeting Cable Requirements on page 21
Understand the dierent cabling options and select the ones that best address your needs.
4 Meeting Power Requirements on page 27
Ensure that power supplies are safe and appropriate for the equipment.
For details about the equipment's power requirements, see the Technical Specifications on page 65.
5 Following Applicable Industry Standards on page 29
VSP 7400 Series Switches: Hardware Installation Guide 16