GE LOGIQ V5/LOGIQ V3
D
IRECTION 5496012-100, REVISION 3 BASIC SERVICE MANUAL
- 2 - 1
Chapter 2
Site Preparations
Section 2-1
Overview
2-1-1 Purpose of chapter 2
This chapter provides the information required to plan and prepare for the installation of LOGIQ V5/
LOGIQ V3. Included are descriptions of the facility and electrical needs to be met by the purchaser of
the unit.
Table 2-1 Contents in Chapter 2
Section Description Page Number
2-1
Overview
2-1
2-2
General Console Requirements
2-2
2-3
Facility Needs
2-6