EasyManuals Logo
Home>GE>Medical Equipment>LOGIQ V3

GE LOGIQ V3 Service Manual

GE LOGIQ V3
170 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #66 background imageLoading...
Page #66 background image
GE LOGIQ V5/LOGIQ V3
D
IRECTION 5496012-100, REVISION 3 BASIC SERVICE MANUAL
3 - 12 Section 3-3 - Receiving and Unpacking the Equipment
3-5-2 Power Off/ Shutdown
NOTE: After turning off a system, wait at least ten seconds before turning it on again. The system may not be
able to boot if power is recycled too quickly.
3-5-2-1 Back-end Processor Power Down
To power down the system:
1.) Press the Power On/Off switch once.
2.) The System-Exit window is displayed.
3.) Using the Set key, select Shutdown.
4.) The shutdown process takes a few seconds and is complete when the power status LED is turned
blue.
5.) Disconnect the probes. Clean or disinfect all probes as necessary. Store them in their shipping
cases to avoid damage.
3-5-2-2 Scanner Shutdown
Disconnect the Mains Power Cable if necessary. For example: Relocating the scanner.
3-5-3 Transducer Connection
1.) Plug the probe connector into the probe port, then lock the probe.
NOTE: Please ensure that the probe latch is in an unlocked position before you connect the probe to the
system.
NOTE: It is not necessary to turn OFF power to connect or disconnect a probe.
Figure 3-4 System-Exit Window

Table of Contents

Other manuals for GE LOGIQ V3

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ V3 and is the answer not in the manual?

GE LOGIQ V3 Specifications

General IconGeneral
BrandGE
ModelLOGIQ V3
CategoryMedical Equipment
LanguageEnglish

Related product manuals