GMV5 D.C INVERTER MULTI VRF SERVICE MANUAL
35
3.3 INSTALLATION SPACE REQUIREMENT FOR ODU
3.3.1 If all sides of the ODU (including the top) are surrounded by walls, process
according to the following requirements for installation space:
(1) Installation space requirements for the single-module unit
(2) Installation space requirements for the dual-module unit