EasyManuals Logo
Home>Gree>Air Conditioner>GUHD series

Gree GUHD series User Manual

Gree GUHD series
219 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #56 background imageLoading...
Page #56 background image
80DWFK6HULHV'&
,QYHUWHU6HUYLFH0DQXDO
53
INSTALLATION
1 INDOOR UNIT INSTALLATION
1.1 Installation of Duct Type
1.1.1 Before Installation
a. $IWHUUHFHLYLQJWKHPDFKLQHSOHDVHFKHFNIRUDQ\WUDQVSRUWGDPDJH,I¿QGLQJDQ\VXUIDFHRULQWHUQDO
damage, please immediately report to the transport company or equipment company in writing.
b. After receiving the machine, please check the unit and accessories in reference to the packing list.
(QVXUHWKDWWKHPRGHOLVFRUUHFWDQGWKHPDFKLQHLVLQJRRGFRQGLWLRQ3OHDVHDOVRFKHFNLIWKHVSHFL¿FDWLRQ
and quantity of accessory parts are correct.
c. Determine the correct handling route and methods, thus to avoid damaging the unit or causing
possible hazard. For the sake of protection and safety, it is suggested to move the unit with the packaging
box. Even though it is not permitted to do like this under special occasions, do not remove the packaging
box, thus to avoid loosening or falling during handling.
d. &RQ¿UPLIWKHLQVWDOOLQJIRXQGDWLRQLVVROLG:KHQWKLVXQLWLVWREHLQVWDOOHGRQWKHPHWDOVHFWLRQRIWKH
building, make sure that the electrical insulation must comply with applicable standards.
e. Ensure that the place of installation is far from the area where the inflammable or explosive
VXEVWDQFHVDUHVWRUHGWKXVWRDYRLGSRVVLEOHH[SORVLRQRU¿UHGXHWROHDNDJH
1.1.2 Installation Site
a. Ensure the top hanging piece has strong strength to withstand the weight of the unit.
b. 7KHGUDLQDJHSLSHKDVFRQYHQLHQWÀRZRIZDWHU
c. There is no obstacle blocking the return air inlet and exhaust outlet, so as to ensure sound air
circulation.
d. The installation spaces required by the drawing must be ensured, so as to provide enough space for
the service and maintenance.
e. 7KHLQVWDOODWLRQVLWHPXVWEHIDUDZD\IURPKHDWVRXUFHOHDNDJHRILQÀDPPDEOHJDVRUVPRNH
f. The indoor unit is of ceiling mount (indoor unit is hidden inside the ceiling).
g. The indoor and outdoor units, the power cable and the connecting electrical lines must be at least 1
meter from any TV set or radio. This is to avoid image interference or noise of the TV set or radio. (Even if
the distance is 1 meter, noise can also exist if there is strong electric wave.)
1.1.3 Caution for Installation
a. Generally, the unit is installed indoor on ceiling. For ceiling mounting, ensure that the hangers on
ceiling have adequate strength to support the weight of the unit.
b. To meet the noise and vibration requirements, the unit shall be installed by using rubber pad
WKLFNQHVVPPDQGUXEEHUFRQQHFWRU
c. ,QVHUWD0H[SDQVLRQEROWLQWRWKHKROH'ULYHDQDLOLQWRWKHEROW5HIHUWRWKHSUR¿OHGLPHQVLRQV
drawing of the indoor unit for the distance between the holes. Refer to Figure 1 for the installation of the
expansion bolt,as Figure 1-1-1 shows.
Figure 1-1-1 Figure 1-1-2
Figure 1-1-3

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Gree GUHD series and is the answer not in the manual?

Gree GUHD series Specifications

General IconGeneral
BrandGree
ModelGUHD series
CategoryAir Conditioner
LanguageEnglish

Related product manuals