Supply power to the Unit
Turn on the power supply of the air conditioners.
Perform after checking of each air conditioner has test run and
confirming all the air conditioners operates normally.
Turn on the power supply of the central controller.
“Loading” will be displayed for a while and the screen changes
to AC Monitor.
5.2 INITIAL POWER ACTIVATION SETTING
Several minutes later after turning ON the power supply, the
language setting screen is displayed on the touchscreen as
shown in the figure.
(When the power supply is turned ON at the first time.)
Select the using language for operation and touch “OK”.
5.3 LANGUAGE SETTING
After language setting, the setting date & time screen is
displayed on the touchscreen as shown in the figure. (When the
power supply is turned ON at the first time.)
After setting the date and time, touch “OK” on the touchscreen
display.
5.4 SET DATE&TIME