BF15DmBF20D
2.
SHIFT
LEVER
(Tiller handle type)
a. REMOVAL
1)
Remove the
2
mm cotter pin and
5
mm washer, disen-
gage the link rod from the shift shaft.
Do
not reuse the
2
mm cotter pin, replace with new one
when reassembly.
2)
Remove the shift lever pivot bolt, 10 mm wave washer,
two
9
mm plain washers,
6
mm plain washer and shift
lever from the tiller handle.
3)
Remove the link rod boot, link rod and shift lever.
b.
INSTALLATION
1)
Apply grease to the link rod end. Connect the link rod to
the shift lever.
2)
Apply grease to the sliding surface of the pivot bolt. Install
the shift lever,
6
mm washer, two
9
mm washers,lO mm
wave washer and tighten the pivot bolt.
TORQUE:
12 N*m (1.2 kgf*m,
9
Ibf*ft)
3)
Set the link rod boot securely.
4)
Connect the link rod to the shift shaft and install the
5
mm
washer and a new
2
mm cotter pin. Spread the end of the
cotter pin as shown.
[91
LINK
ROD
BOOT
r11
5
mm
WASHER
\
\
\
I
[31
LINK
ROD
LEVER
I
I
PI
2
mm
COTTER
PIN
ASSEMBLY:
Do
not reuse.
Replace
with
new one.
Spread the end of the
cotter pin as
shown.
P
PI-1
2
mm
COTTER PIN
13-3