Chapter 3
Install and Cable the Drawers
Next, install the ES47 system into a 29” deep rack cabinet. If upgrading to a Model 4, an
additional 2P drawer will also be installed. Then the interprocessor (IP) cables are installed,
connecting the dual processor modules in the drawers. And finally, the SM LAN cable and
power cables are connected.
Sections in this chapter include:
• Prepare the cabinet
• Install the brackets
• Install the 2P drawer
• Install the IP cables
• Connect SM LAN, ground, and power cables
• Install I/O Cable support and bezel
• Install the 2P drawer
• Replace the side panel
• Setdrawer IDs
• Restore power
Cabling 3-1