Hardware options installation 29
o
Extend the server from the rack.
4. Remove the access panel (on page 7).
5. Remove the air baffle.
For more information, see the server installation sheet on the HP website
(http://www.hp.com/go/bizsupport
).
6. Open the DIMM slot latches.
7. Install the DIMM.
8. Install the air baffle.
9. Install the access panel.
10. For ML110 G6 servers, slide the server back into the rack.
11. For ML150 G6 servers, do one of the following:
o Close or install the tower bezel, as needed.
o Slide the server back into the rack.
If you are installing DIMMs in lock-step configuration, configure this mode in RBSU ("ROM-Based Setup
Utility" on page 40).
For more information about LEDs and troubleshooting failed DIMMs, see the server installation sheet on
the HP website (http://www.hp.com/go/bizsupport).
Expansion board options
For server-specific expansion board installation instructions, refer to the installation sheet that ships with
the server.
CAUTION: To prevent damage to the server or expansion boards, power down the server
and remove all AC power cords before removing or installing the expansion boards.
To install the component:
1. Power down the server (on page 7).
2. For ML110 G6 servers, extend the server from the rack.