EasyManuals Logo
Home>HP>Server>ProLiant ML370 G6

HP ProLiant ML370 G6 User Manual

HP ProLiant ML370 G6
172 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #89 background imageLoading...
Page #89 background image
Hardware options installation 89
12.
If removed, install the BBWC battery pack or the FBWC capacitor pack ("Installing the BBWC battery
pack or the FBWC capacitor pack" on page 86).
13. Install fan 5.
14. Install the access panel.
15. Do one of the following:
o Close or install the tower bezel, as needed.
o Slide the server back into the rack.
16. Power up the server (on page 22, "Powering up and configuring the server" on page 40).
Tower-to-rack conversion kit option
The tower-to-rack conversion kit includes all equipment required to convert the tower model server into a rack
model server and to install the server into most square- or round-hole racks.
The tower-to-rack conversion kit includes:
Rack-mounting hardware kit
Rack bezel
Front video connector cable
T-15 screws (6)
Screwlocks (2)
This document
In addition to the items supplied in the conversion kit, you will also need the following items:
A Torx T-15 screwdriver (clipped to the rear panel of the server)
A 3/16-in nut driver
To convert a tower model server to a rack model server:
1. Power down the server (on page 22).
2. Disconnect all rear panel cabling.

Table of Contents

Other manuals for HP ProLiant ML370 G6

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the HP ProLiant ML370 G6 and is the answer not in the manual?

HP ProLiant ML370 G6 Specifications

General IconGeneral
BrandHP
ModelProLiant ML370 G6
CategoryServer
LanguageEnglish

Related product manuals