INSTALLATION
PREPARING THE WALL - MOUNTING THE BOILER
9 PREPARING THE WALL
10 PREPARING THE BOILER
11 MOUNTING THE BOILER
9
1. Lift the boiler onto the wall mounting plate, entering the
projecting flue duct into the opening cut in the wall, and
lowering the two slots in the boiler back panel onto the
angled tabs on the top of the wall mounting plate.
DO NOT USE THE BURNER ASSEMBLY FOR LIFTING.
2. Remove the controls protection box.
Top cover plate
Flue collector hood
- refer to note 4
LIFT HERE
Wall mounting plate
LIFT HERE
3. Adjust the flue to its horizontal position by
tilting the boiler forward at the bottom and
then turning the jacking plate. Release
and check alignment with a spirit level.
Secure the jacking plate with a
No. 10 x 50 mm wood screw.
4. Remove the flue collector hood (refer
Frame 5, 'Servicing') and ensure that the
flue baffles are fully inserted in the
flueways
5. Fit the top cover plate in position above
the boiler air duct with the two
No.10 x 50 mm screws provided.
6. Make all water connections.
LIFT HERE
LIFT HERE
On no account use the burner
assembly for lifting
Wall mounting
plate
2. Fix the mounting plate to
the wall with the 3 (No. 14 x
50 mm) screws provided.
1. Cut the appropriate hole in the wall for insertion of the
terminal assembly. Note: The terminal must not come into
contact with a combustible material, such as that used in
the non-standard construction of timber framework
and plasterboard etc.
NOTE: THE WALL MUST BE OF SUITABLE LOAD BEARING
CAPACITY.
Carefully place the boiler on its side and stick the self
adhesive sealing tape to the boiler back panel as shown
Note: Do not remove the controls protection box until the
boiler has been lifted onto the wall mounting plate.
Boiler air duct
Sealing tape
REAR VIEW OF BOILER
Boiler flue
duct
The wall must be of suitable load-bearing capacity
The flue duct
should be
horizontal
Dimension 'X'
wall thickness
SIDE VIEWFRONT VIEW
Use the jacking plate
to align the boiler
It is most important that the boiler is
installed in the vertical position
FLUE ALIGNMENT