Attachments
Direct-Mounted Attachments
92 9821/6100-4 92
Direct-Mounted Attachments
General
WARNING If two people are doing this job make sure that the person working the controls is a competent
operator. If the wrong control lever is moved, or if the controls are moved violently, the other person could
be killed or injured.
Installation
This operation is easier done by two people - one person to operate the controls and one to line up the pivots.
1. Set the bucket flat on solid, level ground, using a suitable lifting device.
CAUTION! Do not use your fingers through the holes to align the links.
2. Carefully align the holes in the dipper and bucket link with the bucket. If necessary move the machine to
align the pivot pin holes.
3. Install the pivot pins and lynch pins.
Figure 79.
A Pivot pin B Lynch pin
Removal
1. Slew the boom so that it is straight in front of the machine.
2. Rest the bucket on solid, level ground, with the dipper approximately vertical and the bucket flat to the
ground. Block the bucket to prevent its movement.
CAUTION! Stand clear and to one side of the bucket while you remove the pivot pins. With the pins
removed, the bucket could roll over.
3. Remove the lynch pin and the pivot pins.
4. Using the controls, carefully lift the dipper clear of the bucket.