Operation
Working with the Excavator Arm
70 9821/6100-4 70
6. Swing the bucket back to the excavation and start the next dig.
Backfill the excavation by loading the bucket with soil from the pile. Do not push the soil with the side of the
bucket.
Moving the Machine While Digging
When digging a trench or hole which is longer than the excavator's reach, dig to the required depth and width
until it is not possible to dig any closer without contacting the machine.
Figure 60.
When this position is reached, move the machine a suitable distance away from the excavation.
Figure 61.
Lower the dozer blade until the machine is level, then continue digging.