EasyManua.ls Logo

Komatsu PC130-8 - Page 925

Komatsu PC130-8
1043 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
50 Disassembly and assembly SEN04129-02
PC130-8
15
Installation
q Installation is performed in the opposite way to
removal.
[*1]
2 Surface inside bushing during pin assembly:
Hyper white grease (G2-T)
2 Greasing after pin assembly:
Hyper white grease (G2-T)
k Never put your finger in the pin hole when
adjusting the position.
a Adjust the clearance between the mount on
the boom cylinder bottom and the frame using
the shims so that it becomes 1mm or less.
[*2]
2 Swing circle contacting face:
Liquefied gasket (LG-1)
2 Revolving frame mounting bolt screw:
Liquefied adhesive (LT-2)
3 Revolving frame mounting bolt:
245 – 308.9 Nm {25 – 31.5 kgm}
(Tuget: 279.3 Nm {28.5 kg})
q Supplying oil (hydraulic oil tank)
Supply oil from the oil filler port to the specified
level, start the engine to circulate oil in the pip-
ing and recheck the oil level.
q Bleeding air
Bleed the air. For details , see Testing and
adjusting, "Bleeding air from each part".

Table of Contents

Other manuals for Komatsu PC130-8

Related product manuals