Swing-away lattice
3.4 Description of the rigging work
3 - 30 3 112 441 en Lattice extension operating instructions
GMK 4100/4100-L/5095
11.01.2008
Transport condi-
tion with folded
swing-away lat-
tice
The transport condition is established when all of the following connections
have been made.
Check the connections and establish them if necessary.
When section 1 and section 2 are folded:
–In the
Front area, section 1 must be engaged at the slewing axis (5) on
the main boom and the slewing axis must be secured with the pin (6);
à Establishing the connection, p. 3 - 38.
–In the
Middle area, the connection (4) is in the position Section 1/
Section 2
; à p. 3 - 42.
–In the
Rear area, the connection (2) between section 2 and the main
boom is established;
à p. 3 - 44.
–In the
Rear area, the connection (3) between section 1 and section 2 is
established;
à p. 3 - 48.
The unneeded pin (1) is secured in the retaining sheet.
The pins (7) on section 1 are secured with retaining pins.

Table of Contents

Other manuals for Manitowoc GROVE GMK 5095

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK 5095 and is the answer not in the manual?

Manitowoc GROVE GMK 5095 Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK 5095
CategoryConstruction Equipment
LanguageEnglish

Related product manuals