3.3 Rigging work checklists
Lattice extension operating instructions 3 112 441 en 3 - 15
GMK 4100/4100-L/5095
11.01.2008
3.3.4 CHECKLIST: Rigging the 10 / 17 m (33 / 56 ft) swing-away lattice
H
This checklist is not a complete set of operating instructions. There are
accompanying operating instructions which are referred to by cross-refer-
ences. Observe the warnings and safety instructions there.
1. Rig the truck crane:
Rig the truck crane according to the
CHECKLIST: Rigging; à Operat-
ing instructions.
Before operating the crane, check according to the
CHECKLIST:
Checks before crane operation
; à Operating instructions.
Fully retract the main boom and lower it into a horizontal position.
Roll up the unused hoist rope onto the drum.
2. Check the transport condition of the swing-away lattice;
à Transport
condition with folded swing-away lattice
, p. 3 - 30.
3. With derricking swing-away lattice:
Check whether the locking device on the hose drum has been
released;
à p. 3 - 33.
Bring the hydraulic hoses into the position for operating with the lat-
tice extension;
à p. 3 - 34.
4. For derricking swing-away lattice, establish a hydraulic connection;
à p. 3 - 35.
5. Establish the electrical connection;
à p. 3 - 61.
s

Table of Contents

Other manuals for Manitowoc GROVE GMK 5095

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK 5095 and is the answer not in the manual?

Manitowoc GROVE GMK 5095 Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK 5095
CategoryConstruction Equipment
LanguageEnglish

Related product manuals