Maintenance
9.3 Maintenance overview GMK 5095
Lattice extension operating instructions 3 112 441 en 9 - 3
GMK 4100/4100-L/5095
11.01.2008
9.3 Maintenance overview GMK 5095
9.3.1 Maintenance plan M 1
9.3.2 Maintenance plan M 12
M 1
Maintenance work on the LATTICE EXTENSION:
monthly / after 100 oper. hrs.
Swing-away lattice
– Lubricate pin
à p. 9 - 5
Boom extension
– Lubricate pin
à p. 9 - 5
Auxiliary single-sheave boom top and heavy load lattice extension
– Lubricate pin
à p. 9 - 6
M 12
Maintenance work on the LATTICE EXTENSION:
every 12 months / after 1000 oper. hrs
Swing-away lattice
– Lubricate joints
à p. 9 - 6