EasyManuals Logo
Home>Manitowoc>Construction Equipment>GROVE GMK 5095

Manitowoc GROVE GMK 5095 User Manual

Manitowoc GROVE GMK 5095
286 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #173 background imageLoading...
Page #173 background image
Boom extension
4.1 Rigging work checklists
Lattice extension operating instructions 3 112 441 en 4 - 5
GMK 4100/4100-L/5095
11.01.2008
4.1.2 CHECKLIST: Unrigging the 22 / 27 m (72 / 89 ft) boom extension
H
This checklist is no complete set of operating instructions. There are accom-
panying operating instructions which are referred to by cross-references.
Observe the warnings and safety instructions specified there.
Prerequisites:
An auxiliary crane is available.
1. Fully retract the main boom;
à Telescoping with rigged swing-away lat-
tice
, p. 3 - 90.
2. Only applies to the derricking swing-away lattice.
Raise the swing-away lattice completely;
à Derricking the swing-
away lattice
, p. 3 - 75.
Lower the main boom into a horizontal position;
à p. 3 - 89.
3. Only applies to the inclinable swing-away lattice.
Lower the main boom until the lattice extension is at the correct height
to unreeve the hook block.
4. Take off the lifting limit switch weight and remove the lifting limit
switch;
à Installing / removing the lifting limit switch, p. 3 - 68.
s

Table of Contents

Other manuals for Manitowoc GROVE GMK 5095

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK 5095 and is the answer not in the manual?

Manitowoc GROVE GMK 5095 Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK 5095
CategoryConstruction Equipment
LanguageEnglish

Related product manuals