Swing-away lattice
3.4 Description of the rigging work
3 - 68 3 112 441 en Lattice extension operating instructions
GMK 4100/4100-L/5095
11.01.2008
3.4.15 Installing / removing the lifting limit switch
The functions Lift hoist, extend main boom telescoping, Lower main boom and
Derrick swing-away lattice
are monitored by the lifting limit switch on the
swing-away lattice and switched off, if necessary.
Connection to the
main boom
If the lifting limit switch is removed from the main boom, both connections
must be overridden;
à Operating instructions GMK 4100/4100-L/5095.
If a lifting limit switch remains attached to the main boom, the lifting limit
switch must be blocked;
à Operating instructions GMK 4100/4100-L/5095.

Table of Contents

Other manuals for Manitowoc GROVE GMK 5095

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK 5095 and is the answer not in the manual?

Manitowoc GROVE GMK 5095 Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK 5095
CategoryConstruction Equipment
LanguageEnglish

Related product manuals