EasyManuals Logo
Home>Manitowoc>Construction Equipment>GROVE GMK 5095

Manitowoc GROVE GMK 5095 User Manual

Manitowoc GROVE GMK 5095
286 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #140 background imageLoading...
Page #140 background image
Swing-away lattice
3.4 Description of the rigging work
3 - 70 3 112 441 en Lattice extension operating instructions
GMK 4100/4100-L/5095
11.01.2008
At the 17 m (56 ft)
swing-away lattice
Connecting the lifting limit switch
Fit the lifting limit switch (3) onto the clamp
(2) and secure it with a retaining pin.
Lay the connecting cable (4) in such a way
that it will not be damaged during crane
operation, and insert the lifting limit switch
into the socket (1).
For operation with the 17 m (56 ft) swing-away
lattice, the connection for the lifting limit
switch at the 10 m (33 ft) swing-away lattice
must be overridden with the short-circuit plug.
Removing the lifting limit switch
Pull the plug from the socket (1).
Remove the lifting limit switch (3) from the
clamp (2).
Attach the retaining pin to the lifting limit
switch.

Table of Contents

Other manuals for Manitowoc GROVE GMK 5095

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK 5095 and is the answer not in the manual?

Manitowoc GROVE GMK 5095 Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK 5095
CategoryConstruction Equipment
LanguageEnglish

Related product manuals