GROVE Published 1-20-2017, Control# 483-02 5-5
CD5515-2/YB5515-2 SERVICE MANUAL PREVENTATIVE MAINTENANCE
5
Wire rope cable clamps and connections
Check for loose or missing parts.
Anti-Double Blocking System
Check that the system is working properly.
Controls
Check that all controls are working properly.
After First 50 Hours of Operation
(New Cranes)
Engine
Change the engine oil and filter.
Transmission
Change the transmission oil filter.
Swing Gearbox
Check and tighten mounting bolts.
Hoist Gearbox
Check and tighten mounting bolts.
Swing Gear Pinion and Swing Gear
Lubricate.
Grease Fittings
Apply grease to all grease fittings.
Boom Slides
Lubricate.
Wheel Mounting Nuts
Check Torque.
Cranes Not In Regular Use
A crane which has been idle for a period of one month or
more, but less than six months, must be given an inspection
by a qualified person. This person should use the daily
through monthly inspections.
A crane which has been idle for a period of over 6 months
must be given a complete inspection covering all inspections
through one year, by a qualified person.
Standby cranes must be inspected using the daily through
monthly inspection, by a qualified person.
PREVENTIVE MAINTENANCE
Maintenance Schedule and Checklist
NOTE: Hour intervals in each maintenance chart show the
correct time for service. The hourmeter located in
the operator’s cab indicates the total hours the
crane has been running.
In addition to the following scheduled maintenance,
perform the scheduled maintenance suggested in
the engine manual furnished with the crane.
When performing maintenance, do the required
maintenance interval as well as all previous interval
maintenance. For example, when performing the
250 hour (monthly) maintenance interval, perform
all the tasks required for daily, 50 hour and 100
hour maintenance.
Service Check
Daily
before
operation
50
Hours
Weekly
100
Hours
Two
Weeks
250
Hours
Monthly
500
Hours
Three
Months
1000
Hours
Six
Months
2000
Hours
Yearly
Inspect the anti-double blocking system
x
Inspect the wire rope
x
Inspect reeving, clamps and connections
x
Inspect the lifting hook
x
Inspect safety devices
x
Check controls operation
x
Check engine crankcase oil level
x
Check transmission oil level
x
Check engine coolant level
x
Check fuel level
x
Check tire pressure
x
Reference Only

Table of Contents

Other manuals for Manitowoc Shuttlelift CD5515-2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Shuttlelift CD5515-2 and is the answer not in the manual?

Manitowoc Shuttlelift CD5515-2 Specifications

General IconGeneral
BrandManitowoc
ModelShuttlelift CD5515-2
CategoryConstruction Equipment
LanguageEnglish

Related product manuals