STRUCTURALS CD5515-2/YB5515-2 SERVICE MANUAL
11-14 Published 1-20-2017, Control# 483-02
Wire Rope Installation
Installation of Socket and Wedge
Always connect the socket so that the load is pulled on the
same line as the socket (See Figure 11-5).
When installing the wedge, hit the wedge several times with
a hammer and wood block to make sure the wedge is fully
engaged with the socket. Install cable clamp on the loose
end of the wire rope as shown in Figure 11-5.
To properly seat the wedge, lift a load equal to the rated
capacity of the crane.
Wire Rope Inspection
FIGURE 11-4
a1298
REDUCTION FROM
NORMAL 9/16” (14.3 MM)
DIAMETER OF MORE
THAN 1/32” (0.8 MM)
CAUTION
To prevent personal injury from compressed air, always
wear safety glasses when using compressed air for
cleaning.
.
X = A MINIMUM OF 6 ROPE DIAMETERS, BUT NOT
LESS THAN 6 INCHES (152 MM).
a0025
FIGURE 11-5
a0025
Reference Only

Table of Contents

Other manuals for Manitowoc Shuttlelift CD5515-2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Shuttlelift CD5515-2 and is the answer not in the manual?

Manitowoc Shuttlelift CD5515-2 Specifications

General IconGeneral
BrandManitowoc
ModelShuttlelift CD5515-2
CategoryConstruction Equipment
LanguageEnglish

Related product manuals