EasyManuals Logo
Home>Manitowoc>Construction Equipment>Shuttlelift CD5515-2

Manitowoc Shuttlelift CD5515-2 Service And Maintenance Manual

Manitowoc Shuttlelift CD5515-2
293 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #34 background imageLoading...
Page #34 background image
INTRODUCTION CD5515-2/YB5515-2 SERVICE MANUAL
1-22 Published 1-20-2017, Control# 483-02
O-RING, SEAL AND ELASTIC NUT
REPLACEMENT
Replace O-rings and gaskets whenever they are disturbed.
Never mix new and old seals or O-rings regardless of
condition. Always lubricate new seals and O-rings (unless
stated otherwise) with 10W30 oil or petroleum jelly before
installation. Replace all used elastic locknuts with new parts.
HYDRAULIC PRESSURE TESTING
Prior to pressure testing, be sure all hoses are in good
condition and all fittings are tight.
Use a pressure gauge with a range that is high enough to
measure the specific pressure.
Comply with the correct procedure to inhibit damage to the
system or the equipment and eliminate the possibility of
injury.
Reference Only

Table of Contents

Other manuals for Manitowoc Shuttlelift CD5515-2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Shuttlelift CD5515-2 and is the answer not in the manual?

Manitowoc Shuttlelift CD5515-2 Specifications

General IconGeneral
BrandManitowoc
ModelShuttlelift CD5515-2
CategoryConstruction Equipment
LanguageEnglish

Related product manuals