Ev
ery three months, or in case of prolonged inactivity, use a brush to spread some common cog
grease on the carriage pinion located inside the column (remove casing B) and on the rotating
platform chain (remove sheet A to access it).
5.2.2 CHAIN TENSIONING
Ev
ery three months check the tension of the rotating platform chain by applying a 5-7 kg pressure
at their centre and checking that they do not flex more than 1,5 cm towards the inside. If
necessary, correct the tension with the chain tensioner.
5.3 ELECTRICAL PARTS MAINTENANCE
Before intervening on the machine’s electrical parts:
- get the machine’s technical documentation;
- check that the technical documentation corresponds to the machine (the documentation must
be up-to-date, as difficulties might arise in working on a machine which has undergone
unregistered modifications). Any modification must be registered and added to the
documentation;
- check all the switches that disconnect the machine;
- to operate on power devices in danger conditions there must be more than one worker.
St
op the machine power before operating on electric devices.
CEC BASE IGM REV13 41