POWER UNIT
70
Reproduction or translation, even partial, is forbidden without the written consent of Peugeot Motocycles
- Install a new paper gasket.
- Install the chain tensioner and the
2 attachment screws (2).
Tightening torque: 10 Nm.
- Install the spring (3).
- Fit the chain tensioner gasket (5).
Check the condition of the O-ring and
change it if necessary.
- Install the tensioner cap (4).
Tightening torque: 8 Nm.
Checking the timing
- Rotate the engine twice: 2 revolutions in the
engine's operating direction.
- Rotate the flywheel magneto (1) to bring the
"T" mark in front of the crankcase boss (A).
- Make sure the mark (B) of the camshaft
gear is aligned with the mark (C) of the
cylinder head.
If the marks are not alined, reset the
valve timing.
4
5
2
3
2
A
1
B
C