EasyManuals Logo
Home>Polaris>Offroad Vehicle>RZR XP4 1000 2016

Polaris RZR XP4 1000 2016 User Manual

Polaris RZR XP4 1000 2016
536 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #158 background imageLoading...
Page #158 background image
3.80
9926816 R07 - 2014-2016 RZR XP 1000 / XP4 1000 Service Manual
© Copyright Polaris Industries Inc.
7. Install and finger tighten the two outer M6 bolts
y
evenly.
NOTE
Install new cylinder head bolts.
8. Torque cylinder head bolts in sequence to
specification.
TORQUE
Cylinder Head Torque Procedure:
Torque in sequence
Step 1: 9 ft-lbs (12 Nm)
Step 2: 26 ft-lb (35 Nm)
Step 3: Additional 180°
Step 4: M6 bolts: 7 ft-lb (10 Nm)
CAMSHAFT INSTALLATION / TIMING
NOTE
If any valve train components were replaced, refer to
Valve Clearance Adjustment, page 3.85 procedure prior
to Camshaft Installation / Timing, page 3.80.
1. Rotate the engine until the flywheel Top Dead Center
(TDC) mark
q
is aligned or centered in the
Crankshaft Position Sensor (CPS) mounting hole
w
.
This places the PTO cylinder at TDC for camshaft
installation.
NOTE
DO NOT use the “V” mark located on the flywheel
opposite of the “I” mark. Only the “I” mark should be
used as a TDC reference.
2. Reference the intake and exhaust markings made
during disassembly. If installing new camshafts or if
camshafts were not marked, you can reference the
part number stamped on the end of the shafts and
compare to the electronic parts catalog.
3. Lubricate all camshaft lobes and bearing journal
surfaces with Polaris PS-4 engine oil prior to
installation.
ENGINE / COOLING SYSTEM

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Polaris RZR XP4 1000 2016 and is the answer not in the manual?

Polaris RZR XP4 1000 2016 Specifications

General IconGeneral
BrandPolaris
ModelRZR XP4 1000 2016
CategoryOffroad Vehicle
LanguageEnglish

Related product manuals