— English Fillcontrol Auto Make-up and degassing — 06.07.2016 - Rev. B
6.1 Installation conditions
6.1.1 Incoming inspection
Prior to shipping, this device was carefully inspected and packed. Damages during transport cannot be excluded.
Proceed as follows:
1. Upon receipt of the goods, check the shipment for
• completeness and
• possible transport damage.
2. Document any damage.
3. Contact the forwarding agent to register your complaint.
6.2 Preparatory work
Preparing the device installation:
• Frost-free, well-ventilated room.
– Room temperature range: 0 °C to 45 °C.
• Filling connection.
– If necessary, provide a DN 15 filling connection according to DIN 1988 T 4.
• Electric connection: 230 V~, 50 Hz, 16 A with upstream ELCB: Tripping current 0.03 A.