Installation, connecting up, commissioning
3.2 Installing the CP and commissioning
CP 1243-7 LTE
36 Operating Instructions, 01/2015, C79000-G8976-C381-01
3.2
Installing the CP and commissioning
Prior to installation and commissioning
WARNING
Read the system manual "S7-1200 Programmable Controller"
Prior to installation, connecting up and commissioning, read the relevant sections in the
system manual "S7-1200 Programmable Controller", refer to the documentation in the
Appendix.
When installing and connecting up, keep to the procedures described in the system manual
"S7-1200 Programmable Controller".
Configuration
One requirement for the commissioning of the CP is the completeness of the STEP 7 project
data (see below). You should also read the section "Configuration and operation (Page 41)".
Inserting the SIM card
Note
Inserting and removing the SIM card
Do not insert or r
emove the SIM card while the CP is operating.

Table of Contents

Other manuals for Siemens S7-1200

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens S7-1200 and is the answer not in the manual?

Siemens S7-1200 Specifications

General IconGeneral
Digital InputsIntegrated in CPU or via signal modules (SM)
Digital OutputsIntegrated in CPU or via signal modules (SM)
Analog InputsIntegrated in CPU or via signal modules (SM)
Analog OutputsIntegrated in CPU or via signal modules (SM)
CommunicationPROFINET
Communication Ports1 x PROFINET
I/O ModulesSignal Modules (SM)
ProgrammingSTEP 7
Power Supply24V DC
Operating Temperature0°C to 55°C
Expansion ModulesCommunication Modules (CM), Battery Modules (BM)

Related product manuals