Intelligent Operator Panel (IOP)
Operating Instructions, 08/2015, FW V1.6.1, A5E00110011B AF
9
Ensuring a safe and stable state
During commissioning of the Inverter it is essential to ensure that the system is in a safe
and stable state, as some commissioning processes have the potential to start the motor.
Therefore it is important to secure any loads and ensure that should the motor start, no
potentially dangerous conditions exist.
The IOP can be fitted to and removed from the inverter while power is applied.
The IOP will set the USS PZD (P2012) length to 4 when connected to the inverter.