4 Commissioning
Commissioning is essential for the system, which can protect it against fires,
injury and electric shock.
4.1 Inspection before Commissioning
Check the following items before starting the inverter:
1. All the installation sites are convenient for operation, maintenance and
service.
2. Check and confirm that the inverter is firmly installed.
3. Space for ventilation is sufficient for one inverter or multiple inverters.
4. Nothing is left on the top of the inverter or battery pack.
5. The inverter and accessories are correctly connected.
6. Cables are routed in a safe place or protected against mechanical
damage.
7. The selection of the AC circuit breaker is optimal.
8. The terminals that are not used underneath the inverter are sealed.
9. Warning signs and labels are suitably affixed and durable.
4.2 Button Instruction
The LCD display panel with a screen, an indicator and two buttons is on the
front of the inverter. Please refer to the following table before any operation of
the inverter.
Indicator
Screen Button Button

Table of Contents

Other manuals for Sungrow SG2K5-S

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Sungrow SG2K5-S and is the answer not in the manual?

Sungrow SG2K5-S Specifications

General IconGeneral
BrandSungrow
ModelSG2K5-S
CategoryInverter
LanguageEnglish

Related product manuals