1. Read first 1-14
1. 5 Operation procedure
Check of packed items
-> [1.1 Check product purchase]
Reference
Check of installation site
-> [2.1.1 Installation environment]
Carrying-in to installation site
Installation
-> [2.1.2 How to install]
Removal of top cover -> [2.2 How to remove covers of inverter]
Removal of front cover
-> [2.2 How to remove covers of inverter]
Selection between sink logic/
source logic
-> [2.3.5 Control terminals]
Installation of insert type options
(If necessary)
->[10. 4 Selection of built-in options]
Wiring
Power terminal block -> [2.3.2 Standard connection method,
2.3.3 Power terminal]
Mounting of DC reactor -> [2.3.8 Mounting of DC reactor]
Control terminal block -> [2.3.2 Standard connection method],
[2.3.5 Control terminal]
Connection of communication cables -> [2.3.6 RS485 RS485
communication connectors], [2.3.7 Ethernet connectors]
Other wiring work in the inverter
- Wiring of built-in options -> [10. 4 Selection of built-in options]
- Connection change of cooling fan power supply (when a DC
power supply is used) -> [10. 5 Using DC power supply]
Connection of peripheral devices -> [Chapter 10]