EasyManuals Logo
Home>Toyota>Boom Lifts>7FBEF 20

Toyota 7FBEF 20 User Manual

Toyota 7FBEF 20
185 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #161 background imageLoading...
Page #161 background image
9-10
Explanation of Operation
Material handling valve
1. Pressure compensation mechanism
When pressure compensation mechanism is ON
When solenoid C1 is euergized and non-leak valve is closed, the pressure compensation mechanism
operates as follows:
Pressure oil flowing from port P flows from chamber (a) through orifice A to chamber (b), then flows
through orifice B to chamber (c).
The opening aperture of oil passage E is determined by the equilibrium of chamber (b), chamber (c)
and spring 1.
This controls the oil pressure of chamber (a) at a fixed pressure higher than the oil pressure in
chamber (c).
Pressure oil that has flowed through the pressure reducing valve flows to chamber (f), then flows
through orifice D to chamber (e).
The pressure oil in chamber (c) flows into chamber (d) and the pressure compensation valve is
operated by the equilibrium of chamber (c), chamber (d) and spring 2.
This controls the oil pressure of chamber (d) at a fixed pressure higher than the oil pressure in
chamber (e).
Chamber (d) and chamber (c) are connected by orifice C, so they have the same oil pressure, and the
pressure differential between chamber (a) and chamber (f) is kept constant by operation of the unload
valve and the pressure compensation valve.
This pressure differential is detertimed by spring 1 and spring 2.
When the oil pressure in chamber (a) becomes high, the oil drains from the pilot relief valve of the
unload valve.
Accordingly, the maximum oil pressure of chamber (a) is detertimed by the installation load of spring 3.
Pressure compensating function (sectional view of inlet section)
When the pilot relief valve is opened
When the pilot relief valve is closed
Main flow/excess flow
Pilot flow
Unload valve
Spring 1
Spring 3
Spring 2
Pressure compensation valve
Port PPort T1
Non-leak valve
Solenoid C1
C
(d)
(c)
E (a)AB
(b)
(f)
(e)

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Toyota 7FBEF 20 and is the answer not in the manual?

Toyota 7FBEF 20 Specifications

General IconGeneral
BrandToyota
Model7FBEF 20
CategoryBoom Lifts
LanguageEnglish

Related product manuals