94
SS-SVX11K-EN
Pre-Start
Use the checklist provided below in conjunction with
the “General Unit Requirement” checklist” to ensure
that the unit is properly installed and ready for
operation. Be sure to complete all of the procedures
described in this section before starting the unit for the
first time.
WWAARRNNIINNGG
HHaazzaarrddoouuss VVoollttaaggee!!
FFaaiilluurree ttoo ddiissccoonnnneecctt ppoowweerr bbeeffoorree sseerrvviicciinngg ccoouulldd
rreessuulltt iinn ddeeaatthh oorr sseerriioouuss iinnjjuurryy..
DDiissccoonnnneecctt aallll eelleeccttrriicc ppoowweerr,, iinncclluuddiinngg rreemmoottee
ddiissccoonnnneeccttss bbeeffoorree sseerrvviicciinngg.. FFoollllooww pprrooppeerr
lloocckkoouutt//ttaaggoouutt pprroocceedduurreess ttoo eennssuurree tthhee ppoowweerr
ccaann nnoott bbee iinnaaddvveerrtteennttllyy eenneerrggiizzeedd.. VVeerriiffyy tthhaatt nnoo
ppoowweerr iiss pprreesseenntt wwiitthh aa vvoollttmmeetteerr..
Turn the field supplied disconnect switch, located
upstream of the unit, to the “Off” position.
NNoottee:: Verify that the 115 volt control switch (1S2) in
the unit control box is in the "Off" position.
Turn the “System” selection switch (at the Remote
Panel) to the “Off” position and the “Fan” selection
switch (if applicable) to the “Auto” or “Off”
position.
Check all electrical connections for tightness and
“point of termination” accuracy.
Verify that the condenser airflow will be
unobstructed.
Check the condenser fan blades. Ensure they rotate
freely within the fan orifices and are securely
fastened to the fan motor shaft.
Disable the compressor(s) by unplugging the reset
relay for each circuit. Refer to the unit-wiring
diagram that shipped with the unit.
NNOOTTIICCEE
CCoommpprreessssoorr DDaammaaggee!!
EExxcceessssiivvee lliiqquuiidd aaccccuummuullaattiioonn iinn tthhee ssuuccttiioonn lliinneess
ccoouulldd rreessuulltt iinn ccoommpprreessssoorr ddaammaaggee..
DDoo nnoott aallllooww lliiqquuiidd rreeffrriiggeerraanntt ttoo eenntteerr tthhee ssuuccttiioonn
lliinnee..
Verify that all compressor service valves, discharge
service valves, and liquid line service valves are
back seated on each circuit.
IImmppoorrttaanntt:: COMPRESSOR SERVICE VALVES MUST
BE FULLY OPENED BEFORE START-UP
(SUCTION, DISCHARGE, AND LIQUID
LINE).
IImmppoorrttaanntt:: After liquid line service valves are fully
opened (back seated), close just 1/4 turn
to allow for fan pressure control (4S7,
4S8) operation.
Check the compressor oil levels. Oil levels must be
near or above the top of all compressor sight
glasses.
PPaacckk SSttoocckk UUnniittss:: Two low pressure switches are
installed at the factory. However, only one is wired
into the control circuit. This is to facilitate an EVP
chiller or air over evaporator application. Before
starting the system, verify that the correct pressure
switch is connected to the control circuit. See
Pressure Control Switch Settings table in Start-Up
chapter for the pressure control settings, and the
unit wiring diagram that shipped with the unit, for
the appropriate connections.
Check the condenser coils. They should be clean
and the fins should be straight. Straighten any bent
coil fins with an appropriate sized fin comb.
Inspect the interior of the unit for tools and debris.
EVP Chiller Applications
Flush building piping.
NNOOTTIICCEE
HHeeaatt EExxcchhaannggeerr DDaammaaggee!!
FFaaiilluurree ttoo ffoollllooww iinnssttrruuccttiioonnss bbeellooww ccoouulldd rreessuulltt iinn
hheeaatt eexxcchhaannggeerr ddaammaaggee..
IIff aann aacciiddiicc ccoommmmeerrcciiaall fflluusshhiinngg ssoolluuttiioonn iiss uusseedd,,
bbyyppaassss tthhee EEVVPP cchhiilllleerr ttoo pprreevveenntt ddaammaaggee ..
Clean strainer. Make sure strainer blow down valve
or plug is in place.
Connect chiller. Make sure chiller 1/2”x14 NPTE
plug is in place.
Close drain valve
Fill system with water.
Vent system piping at the highest points.
Inspect water piping for leaks and repair.
System Evacuation Procedures
NNOOTTIICCEE
OOppeerraattiinngg UUnnddeerr VVaaccuuuumm!!
FFaaiilluurree ttoo ffoollllooww tthheessee iinnssttrruuccttiioonnss wwiillll rreessuulltt iinn
ccoommpprreessssoorr ffaaiilluurree..
DDoo nnoott ooppeerraattee oorr aappppllyy ppoowweerr ttoo tthhee ccoommpprreessssoorr
wwhhiillee uunnddeerr aa vvaaccuuuumm..
Each refrigeration circuit for split system applications
must be evacuated before the unit can be started. Use a
rotary type vacuum pump capable of pulling a vacuum
of 100 microns or less. Verify that the unit disconnect
switch and the system control circuit switches are
“OFF”.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Trane RAUJ-C20 and is the answer not in the manual?

Trane RAUJ-C20 Specifications

General IconGeneral
BrandTrane
ModelRAUJ-C20
CategoryAir Conditioner
LanguageEnglish

Related product manuals