Installation
Installation and maintenance instructions ecoTEC 0020173113_01 13
4
Item Qty Description
1 1 Wall bracket
2 1 Boiler
3 1 Flow restrictor
44
Supply pipes (gas, heating, expansion relief
valve)
5 3 Service valves
6 1 Montageschablone
7 1 Enclosure documentation
8 2 Bags with parts
4.2 Scope of delivery for ecoTEC VU boiler
1
2
3
4
6
5
7
8
4.2 Scope of delivery for ecoTEC VUW boiler
Item Qty Description
1 1 Wall bracket
2 1 Boiler
3 1 Flow restrictor
46
Supply pipes (gas, heating, water, expansion
relief valve)
5 4 Service valves
6 1 Installation template
7 1 Enclosure documentation
8 2 Bags with parts
4.3 Scope of delivery for ecoTEC VUW boiler
4.2.3 Disposing of the packaging
> Dispose of the cardboard packaging used on the ecoTEC
at a cardboard recycling site.
> Dispose of the plastic film and plastic filling at an appro-
priate plastic recycling site.
> Observe national regulations.
4.3 Transporting the appliance
Important:
With regards to the Manual Handling Operations, 1992 Reg-
ulations, the following lift operation exceeds the recom-
mended weight for a one man lift.
General recommendations when handling
> Clear the route before attempting the lift.
> Ensure safe lifting techniques are used – keep back
straight – bend using legs.
> Keep load as close to body as possible. Do not
twist – reposition feet instead.
> If 2 persons performing lift, ensure co-ordinated move-
ments during lift.
> Avoid upper body/top heavy bending - do not lean
forward/sideways.
> Recommend wear suitable cut resistant gloves with good
grip to protect against sharp edges and ensure good
grip.
> Always use assistance if required.
Removal of carton from delivery van
Recommend 2 person lift or 1 person with use of sack truck.
> If 1 person is performing lift, straddle the load, tilt and
place carton into position on truck.
> Recommend secure appliance onto truck with suitable
straps.
> Ensure safe lifting techniques are used – keep back
straight – bend using legs.
> Keep load as close to body as possible.
> If 2 persons performing lift, ensure co-ordinated move-
ments during lift.
> Always use assistance if required.
Carriage of carton from point of delivery to point
of installation – ground floor.
Recommend 2 person lift or 1 person with use of sack truck.
> If 1 person is performing lift, straddle the load, tilt and
place carton into position on truck.
> Recommend secure appliance onto truck with suitable
straps.
> Ensure safe lifting techniques are used – keep back
straight – bend using legs.
> Keep load as close to body as possible.
> If 2 persons performing lift, ensure co-ordinated move-
ments during lift.
> Clear the route before attempting the lift.