4.10 General Sequence of Operation
Follow the sequence of operation below. Refer to the specific topic for details.
Task When/Where See Topic
1. Check HTF level. Before leaving for the job site.
Or, when at the job site before
daily operation.
4.11 / 4.15
2. Check fuel level. 4.13 / 4.15
3. Position the machine. At the job site. 4.14
4. Perform pre-starting checks. 4.15
5. Connect power. 4.16
6. Start the generator (if equipped) 4.17
7. Power up the machine. 4.18
8. Run the machine. —
a. Preheat the HTF (if necessary). 4.19
b. Initiate HTF flow. 4.20
c. Unwind and position the hoses. 4.22 / 4.23
d. Monitor the operating parameters. 4.24
e. Rewind the hoses. 4.25
9. Shut down and pack up the machine. 4.26