EasyManuals Logo
Home>Cisco>Switch>SD208T-NA

Cisco SD208T-NA User Manual

Cisco SD208T-NA
283 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #61 background imageLoading...
Page #61 background image
7
Cisco Small Business 200 Series Smart Switch Administration Guide 62
Managing Device Diagnostics
This section contains information for configuring port mirroring, running cable
tests, and viewing device operational information.
It covers the following topics:
Testing Copper Ports
Displaying Optical Module Status
Configuring Port and VLAN Mirroring
Viewing CPU Utilization and Secure Core Technology
Testing Copper Ports
The Copper Test page
displays the results of integrated cable tests performed on
copper cables by the Virtual Cable Tester (VCT).
VCT performs two types of tests:
Time Domain Reflectometry (TDR) technology tests the quality and
characteristics of a copper cable attached to a port. Cables of up to 140
meters long can be tested. These results are displayed in the Test Results
block of the Copper Test page.
DSP-based tests are performed on active GE links to measure cable length.
These results are displayed in the Advanced Information block of the
Copper Test page.
Preconditions to Running the Copper Port Test
Before running the test, do the following:
(Mandatory) Disable Short Reach mode (see the Port Management >
Green Ethernet > Properties page)

Table of Contents

Other manuals for Cisco SD208T-NA

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Cisco SD208T-NA and is the answer not in the manual?

Cisco SD208T-NA Specifications

General IconGeneral
BrandCisco
ModelSD208T-NA
CategorySwitch
LanguageEnglish

Related product manuals