54 4–20kVA Users Guide P-164000669 4–20kVA Users Guide P-164000669—Rev 09
Figure 47. Split Phase Input
4. Connect the AC ground cable into the ground lug and tighten the lug screw.
5. Connect the EBM AC input cables to the dedicated 30 amp AC circuit and the DC output cables to the UPS
(See Figure 43).
6. Reinstall the AC and DC terminal covers.
Connected Battery Cabinet Option