EasyManuals Logo

Gree SXVD200LCJ/A-K User Manual

Gree SXVD200LCJ/A-K
391 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #212 background imageLoading...
Page #212 background image
GMV5 Home DC Inverter Multi VRF Units
206
Make sure the compressor has been preheated for more than 8 hours.
When unit commissioning is started, the system automatically selected an operation mdoe
according to the environment temperature.
a. When outdoor temperature is higher than 20, commissioning should be in cooling mode
and water heating mode.
b. When outdoor temperature is lower than 20, commissioning should be in heating mode
and water heating mode.
Note: If system is not connected with water tank or the water heating function of hydro box is
wrongly set, unit will not run in water heating mode.
⑶、Before starting commissioning, make sure again that stop valves of all basic modules of
the outdoor unit have been completely opened.
⑷、 During commissioning, the front panel of outdoor unit must be completely covered.
Otherwise, commissioning accuracy may be affected (as shown in the following figure).
⑸、 Before commissioning, make sure that additional refrigerant to pipes has been finished
completely or for more than 70%.
⑹、 The following table describes progress display of each phase during commissioning:
Progress Description for Commissioning Phases
——
Commissioning
code
Progress code
Status code
Meaning
Progress
LED1
LED2
LED3
Code
Display
status
Code
Display
status
Code
Display
status
01_Master unit
setting
db
ON
01
ON
A0
ON
System is in non-commissioning

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Gree SXVD200LCJ/A-K and is the answer not in the manual?

Gree SXVD200LCJ/A-K Specifications

General IconGeneral
BrandGree
ModelSXVD200LCJ/A-K
CategoryInverter
LanguageEnglish

Related product manuals