EasyManuals Logo
Home>Hitachi>Heat Pump>YUTAKI S Series

Hitachi YUTAKI S Series Installation And Operation Manual

Hitachi YUTAKI S Series
77 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #63 background imageLoading...
Page #63 background image
54
PMEN0643 rev.0 - 04/2023
7
REMOVING THE COVERS
MAINTENANCE
7.1.0.3 Space heang pipes connecon
The unit is factory supplied with two shut-o valves which have to be connected to the water inlet
/ outlet connecons. With these shut-o valves it is very praccal to connect the indoor unit to the
heang system by using the factory supplied gaskets just below the valves. Then, the space heang
installaon can be carried out.
Gaskets
Shut-o valves
7.1.0.4 Drain pipes connecon
For a correct drainage, connect the drain pipe for the safety valve to the general draining system.
NOTE
The safety valve is acvated when water pressure reaches 3 bars.
Drain taps must be provided at all low points of the installaon to permit complete drainage of
the circuit during servicing.

Table of Contents

Other manuals for Hitachi YUTAKI S Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hitachi YUTAKI S Series and is the answer not in the manual?

Hitachi YUTAKI S Series Specifications

General IconGeneral
BrandHitachi
ModelYUTAKI S Series
CategoryHeat Pump
LanguageEnglish

Related product manuals