Hardware options installation 64
o
Full-height device
7. Connect the data and power cables to the rear of the device.
8. Slide the drive into the bay until it clicks.
9. When shipping a server with a full-height device installed, replace the front guide screw with a shipping
screw ("Installing the full-height media device shipping screw" on page 64).
10. Install the access panel (on page 27).
11. Do one of the following:
o Close or install the tower bezel, as needed.
o Slide the server back into the rack.
Installing the full-height media device shipping screw
When shipping a server with a full-height media device installed, always install a shipping screw to secure
the device.
1. Install the full-height media device ("Installing a half-height or full-height media device" on page 63).
2. Remove the front guide screw from the full-height media device.