3. Rotate the upper bezel to the left side of the chassis until the bezel clips are
aligned with the corresponding indentations on the left side of the chassis and
snap them into place.
Replacing the air baffle
This procedure applies only to 4U server models with non-hot-swap power
supplies.
To install the air baffle into 4U server models with non-hot-swap power supplies,
complete the following steps.
1. Read the safety information in “Safety” on page vii and “Installation
guidelines” on page 35.
2. Align the tabs on the air baffle with the slots on the chassis.
3. Lower the air baffle into the server.
Attention:
v Make note of the microprocessor power cable routing, as the cable may
interfere with the air baffle installation.
Bezel clips
Figure 61. Upper bezel installation for 5U server model with hot-swap power supplies
Chapter 2. Installing optional devices 85